Exhibitor Manager DOCS & HELP

Expo Launch Timeline Checklist

A schedule for your next fair. It is a suggestion, not a rule – what matters is the order: structure first, then exhibitors, then plans, print last.

WhenTask
8 weeks beforeSet up the plugin, create the event, build types, categories and locations.
6 weeks beforeCollect exhibitor data and import it by CSV with a target event.
5 weeks beforePublish the directory page – with booth information hidden globally if needed.
4 weeks beforeAttach the SVG hall plans to the event, match IDs with booth IDs, create the hall plan page.
3 weeks beforeComplete logos, galleries, descriptions and contact details; decide on featured exhibitors.
2 weeks beforeClear the dashboard: all audit tiles at zero. Show booth information.
1 week beforePrint the exhibitor list for the fair guide and the booth signs.
During the fairChange last-minute moves and cancellations in the Mass Editor – directory, plan and detail pages are correct immediately.
After the fairCSV export and settings backup as an archive, evaluate favorite counts in the dashboard.

Tick off before launch

  • Every exhibitor is assigned to the event and has a booth ID and location.
  • The page with [event_exhibitor_list] shows all entries; the filters contain only sensible values.
  • A click on every booth area opens the right info sheet.
  • “View on map” jumps to the right booth.
  • Detail pages open without “Page not found”.
  • A current CSV export is ready as a backup.
Half the work

is preparation, the other half is the dashboard. Setting up types, categories and locations cleanly once saves you a hundred individual corrections.